| Japanese |
 |
|
|
 |
 |
 |
 |
 |
 |
 |
| |
|
|
|
|
|
| |
 |
|
| |
|
|
| |
|
|
|
|
|
| |
‘ Factory No. 1 |
|
|
|
| |
| Components for medium-sized presses and those requiring high accuracy are
machined at this factory which is equipped with a five-face machining center. |
|
|
 |
|
| |
|
|
|
|
|
| |
‘ Factory No. 2 |
|
|
|
|
| In addition to welding hydraulic cylinders, a process requiring special
technology and cutting-edge machines, large components such as press frames
and frames of liquid crystal related devices are machined with a horizontal
boring machine. |
|
|
 |
|
| |
|
|
|
|
|
| |
‘ Factory No. 3 |
|
|
|
| |
| At this factory, assembly and adjustment of bottling machines, packaging
machines, labelers, pharmaceutical equipment, and other machines are performed. |
|
|
 |
|
| |
|
|
|
|
|
| |
‘ Factory No. 4 |
|
|
|
|
| This is our main and largest factory which is equipped with an overhead
traveling crane with a span of 15 m and a maximum lifting capacity of 50
tons. Assembly, test runs, and adjustment of presses are performed at this
factory. |
|
|
 |
|
| |
|
|
|
|
|
| |
‘ Factory No. 5 & No. 6 |
|
|
|
|
| These factories are large cleanrooms featuring full-scale dustproof equipment
and cranes. Assembly and adjustment of liquid crystal related devices are
performed. |
|
|
 |
|
| |
|
|
|
£TOP |
|
| |
|
|
|
|
|
 |
 |
| Website Policies |